02/SELECTED CONTRIBUTIONS
Scope of Work
01
Parking Garage & Vertical Circulation
Supported design development and construction documentation for the below-grade parking garage, including parking layouts, ramps, stairs, egress routes and coordination across multiple levels.
02
Ground Floor & Podium Coordination
Developed and coordinated ground-floor architectural documentation, integrating consultant information and resolving interfaces between the podium, circulation and public-facing spaces.
03
BIM & Technical Coordination
Maintained Revit models and drawing sets, supported pile and consultant coordination, assisted with specifications and helped carry technical information consistently through SD, SPA, DD and CD.










